The Tiny Studio

The Tiny Studio

The studio’s work has now begun again in our new custom studio in Edmonton, Alberta. Many thanks to the family and friends who helped create this new working space.
October 8th, 2025
Finishing the Siding

Finishing the Siding

With help from Elise, the final length of siding was installed today. With the studio now fairly sealed from the elements, work can begin on the interior.
July 16th, 2025
Hanging the Door

Hanging the Door

With the siding well under way, Michael and I took the time to hang the metal door he salvaged from his work at Mount Carmel last year. It’s very nice to have such a solid door for the studio.
July 14th, 2025
Siding all over

Siding all over

Layer by layer the cedar siding is stacking up to cover the studio’s walls. Of course, since the design of the studio isn’t completely conventional, there are a few places were extra care and creativity are necessary—as here, where Adèle is finishing the underside of the double roof.
July 12th, 2025
Starting the Siding

Starting the Siding

One of the special details we have planned for the the tiny studio is to use cedar bevel siding for it’s exterior. So, with Elise holding our newly created storyboard pole (so we can get the spacing right), we’re ready to start hanging.
July 10th, 2025
Wrapping it up

Wrapping it up

With the insulation all squeezed between the studio’s studs, we’re ready to wrap up the outer walls.
July 7th, 2025
Insulating

Insulating

We ended up using foundation insulation for the Tiny Studio because were able to get a lot of it for cheap (as you can see from the early truck load photo.) Michael ended up taking the lead on tightly fitting each section, which ended up being pretty miserable work, but he got it done without […]
July 5th, 2025
Finished Roofing

Finished Roofing

After a couple of days of hard word, Adèle has finished shingling the roof in the wonderful blue shingles we found at our local reStore. She did a very careful job, and everything looks great.
July 5th, 2025
Starting the Roof

Starting the Roof

With the walls framed and together, today we’re beginning the studio’s roof.
July 3rd, 2025
Making a Mess

Making a Mess

With the building space being small, and all of our materials piling up, our working area is getting tight for the build. But, we’ve got the walls up and we’re ready to begin the rafters.
July 2nd, 2025
Building The Walls

Building The Walls

With a solid foundation in place, it’s time to start building the Tiny Studio’s walls. And, while she wasn’t thrilled with having her photograph taken, my daughter Adèle was very excited to help frame the studio this week.
July 1st, 2025
Signing the Build

Signing the Build

With the work finished, everyone in our family signed the final board and then the subfloor was complete.
June 30th, 2025
Solid Subfloor

Solid Subfloor

One of the very interesting things about our home in Edmonton is that the builder built its subfloor using 2x6s instead of the usual 5/8″ plywood. This has meant solidness that I’ve really enjoyed from our floors. And, since we got a bundle of 2x6s from reStore West, this turned out to be the better […]
June 28th, 2025
Skid Foundation

Skid Foundation

Here we are flipping our new foundation … Since the Tiny Studio might someday find its way to another location (ideally something a little more remote and outside the city), it’s being built on a skid foundation. We started building the foundation by laying out the studio’s floor joists and then lagging them to the […]
June 28th, 2025
Planning to Keep Warm

Planning to Keep Warm

The other great find at Edmonton’s Restore West was these pallets of insulation. While they won’t be as nice to work with as regular fiberglass batts, they have an excellent R-value and will do a great job of keeping the studio work this winter.
June 6th, 2025
A Load of Green Lumber

A Load of Green Lumber

Since losing the studio space I was renting, I’ve been thinking about what the best option is for painting. This has led to some interesting conversations with friends and a re-imaging of the studio’s work … Shortly after the dust settled, I connected with my friend, David Goa, and our meandering conversation touched upon his […]
June 5th, 2025
The Consecrated Altar

The Consecrated Altar

And so, with the Archbishop pouring out holy chrism oil onto the altar and proceeding to spread it across the altar table’s entire surface with his hand, the altar at Mt. Carmel is consecrated!
July 16th, 2024
Sealing the Altar

Sealing the Altar

I was honoured to be invited to seal the altar during the chapel’s consecration. So, with the relics safely entombed, I set the table’s stone in place and sealed it in an act of completion.
July 16th, 2024
Waiting for a blessing

Waiting for a blessing

Now the altar waits for the Bishop to come and consecrate it (and the new chapel) for use. My boys and I have been invited to attend and I’m looking forward to it next week.
July 12th, 2024
Grateful for the help

Grateful for the help

After a herculean effort (especially moving the altar’s stone table) everything came to rest in place and there was a moment of fellowship among the friends who had helped.
July 12th, 2024
All Loaded up

All Loaded up

Believe it or not, my son and I were able to load up the altar by ourselves by sliding it up on two lengths of plywood. And, after covering it up and strapping it down I made the trip up to the Mt. Carmel Spirituality Centre without incident.
July 12th, 2024
Finishing the Altar’s Woodwork

Finishing the Altar’s Woodwork

It’s a beautiful moment seeing the altar’s woodwork finished with multiple coats of linseed oil and beeswax.
July 11th, 2024
Placing the Altar Panels

Placing the Altar Panels

It’s pretty amazing how much the final woodworking step of inserting the panels finishes the altar’s woodworking. Although no one will likely see it again, I’m quite pleased with even how the inside turned out …
July 10th, 2024
Putting All the Pieces Together

Putting All the Pieces Together

It’s always an exciting moment in a project when all the pieces get put together … I think that all the planning and work is going to pay off.
July 9th, 2024
Attaching the first Columns

Attaching the first Columns

The triple columns on the altar’s outer legs proved to be the element of its design that was the hardest to make. It took a little bit of figuring out how to hollow out the columns so they would fit tightly on the altar’s outer pillars, but the effort was worth it, and I’m happy […]
July 6th, 2024
Wood Turning

Wood Turning

I really haven’t had a lot of experience turning wood on a lathe, but after a morning of doing so I think I quite like it. Best of all, the wood blanks turned out looking great. Now all that’s left is cutting and fitting them to the altar’s main legs …
July 5th, 2024
Frankenlathe

Frankenlathe

After a couple of days trying to piece together something to turn the altar’s columns (and one very bad experience with a wood blank coming off the lathe’s spurs mid turning!) I’ve got something that works and which I’m dubbing the “Frankenlathe“.
July 3rd, 2024
Altar Feet

Altar Feet

After making all the pieces and carefully fitting everything together, the final feet for the altar in in place … And, I’m quite pleased with how they turned out.
June 27th, 2024
Resawing

Resawing

While most of the altar is being made with 1½” lumber, there are parts of it that will be ¾”, so Adele and I needed to resaw some of stock into thinner slabs. I was really grateful for the help today, as balancing such long lengths by myself would be very difficult.
June 25th, 2024
Adding the Structural Cradle

Adding the Structural Cradle

I think I’ve already mentioned the challenge of building an 8′ altar in a space that’s 9′ wide … When adding the structural cradle today, I was very glad of the nice weather so I could roll the work out into the back alley and complete it without the studio’s space limitations.
June 12th, 2024
Every Woodworker Says It …

Every Woodworker Says It …

… and they’re right—There are never enough clamps for a project. Although the altar’s bottom corners went together incredibly well, getting an even pressure on each glue seam takes a lot of setup. I’m now wondering if the studio may need to invest in additional clamps before the project is done.
June 10th, 2024
Table Stone Found

Table Stone Found

It’s been a long search, but today I finally found the most beautiful stone slab for altar’s table outside Calgary.
May 30th, 2024
Fitting the Altar’s Structure

Fitting the Altar’s Structure

Mocking up the altar’s structure (and holding it together with straps.)
May 29th, 2024
Picking Structural Lumber (Attempt #2)

Picking Structural Lumber (Attempt #2)

Loading up all the lumber needed for building the structure of the altar (with my wife’s car!)
May 9th, 2024
Building a Workshop Table

Building a Workshop Table

One of the problems I’m facing in making this altar is my need for more space. Currently, my woodworking space is only 9 feet wide, and with the altar being 8 feet wide, I needed to devise a way of getting around it. My solution was to build a table for the workshop that I […]
May 7th, 2024
Structural Wood Failure

Structural Wood Failure

After letting the structural wood dry over the weekend, I’m faced with a significant problem. Every length of the lumber I prepared has twisted, warped, and bowed (as you can see from the winding sticks, which should be parallel but definitely aren’t!) While I could probably pull the wood straight using lag screws, this wouldn’t […]
April 29th, 2024
Drying Structural Wood

Drying Structural Wood

With the cutting and planning finished the wood now needs to be dried. Since it was being stored outside, its moisture content is very high, and I’m hoping I can help get it dry enough to use fairly quickly (hence the fan in the bottom of the photo.)
April 26th, 2024
Preparing Structural Wood

Preparing Structural Wood

After much searching, I’ve found three long lengths (24 feet each!) of Douglas fir 2x12s that I can cut up to form the wood I need for the altar’s structure.
April 23rd, 2024